+
  • buzhou12.jpg

Installation Step 11


The edge of the ceiling tile shall be hammered with rubber to seal and glue around. It is strictly prohibited to directly trample on the single roof tile during construction. It is necessary to prepare two square pipes to assist construction before stepping on the square pipe.

Category:

Keywords:

Hotline:

17591673888

  • Product Description
    • Commodity name: Installation Step 11

    The edge of the ceiling tile shall be hammered with rubber to seal and glue around. It is strictly prohibited to directly trample on the single roof tile during construction. It is necessary to prepare two square pipes to assist construction before stepping on the square pipe.

ONLINE CONSULT

Message Feedback

RELATED PRODUCTS